Multi-Link SR-3 Betriebsanleitung Seite 20

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 27
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 19
Multiple Line
Installation
A.
Before
a Key System
Ring
Supervision:
Excellent
Barge-in
Protection:
Excellent
Install,
Ease/Expense
Good
TO KEY PHONES
You
can only
install
your SR
on
the CO* side of the KSU.
You
cannot
install
it
on
the station or extension
side.
1) Disconnect the desired line from the KSU.
2) Mount the SR
in
a convenient location near the KSU. Under two of the
feet
on
the SR are mounting slots.
3) At the
demarc,
install
an
RJ-11 if one
does
not exist.
Label
it “LINE”.
Attach the “LINEjack of the SR to this RJ-11 with the supplied line
cord.
Shorten if desired.
*
Telephone company
18
SR
Serles
Seitenansicht 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 26 27

Kommentare zu diesen Handbüchern

Keine Kommentare