Multi-Link SR-2 Installationshandbuch

Stöbern Sie online oder laden Sie Installationshandbuch nach Prozessoren Multi-Link SR-2 herunter. Multi-Link SR-2 Installation manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 71
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Installation Manual-A
Providing equipment and services to manage controlled-temperature environments for
food and other temperature-sensitive products, our Climate Control Technologies sector
encompasses both transport and stationary refrigeration solutions. Our product brands include
Thermo King®, a world leader in transport temperature control systems, and Hussmann®, a
manufacturer of refrigeration and food merchandising equipment.
www.thermoking.com www.hussmann.com www.ingersollrand.com
©2009 Ingersoll-Rand Company
Printed in U.S.A. on Recycled Paper
Trailer Edition
SPECTRUM
TM
DE SR-2
Multi-Temperature Systems
TK 53542-2-IM (Rev. 7, 06/12)
Seitenansicht 0
1 2 3 4 5 6 ... 70 71

Inhaltsverzeichnis

Seite 1 - Installation Manual-A

Installation Manual-AProviding equipment and services to manage controlled-temperature environments for food and other temperature-sensitive products

Seite 3 - Release History

10Evaporator Opening RequirementsEvaporator OpeningThe location of the unit mounting bolts and evaporator opening in the front wall is critical.VERIFY

Seite 4

11Evaporator Opening Requirements

Seite 5 - Introduction

12Mounting Hardware RequirementsMounting BoltsNOTE: The location of the unit mounting bolts in the trailer front wall is critical to proper unit insta

Seite 6 - Table of Contents

13Mounting Hardware Requirements

Seite 9

16Battery Selection GuideRefer to Service Bulletin T&T 446 for more information regarding Battery Selection and Maintenance.IMPORTANT: The specifi

Seite 10 - Trailer Requirements

17Group 31 Battery Dimensions

Seite 11 - Evaporator Opening

18Lifting Bar DimensionsI. Recommended material: 76.2 mm (3.00 in.) x 12.7 mm (0.50 in.) mild steel.II. Use forged chain links and hooks, clevis and p

Seite 12

Installation Manual—ATrailer EditionSPECTRUM™ DE SR-2Multi-Temperature SystemsTK 53542-2-IM (Rev. 7, 06/12)Copyright© 2006 Thermo King Corp., Minneapo

Seite 14

20Surface Mounted Status Light Dimensions (Option)Contact your Thermo King Dealer for specific part numbers.Standard Display and Fuel Combo DisplayTri

Seite 15 - Unit Dimensions

21Flush Mounted Status Light Opening Dimensions (Option)Contact your Thermo King Dealer for specific part numbers.NOTE: Dimensions shown will accommod

Seite 16 - BLANK PAGE

22Rear Remote Controller Dimensions (Option) Contact your Thermo King Dealer for specific part numbers.

Seite 17 - Battery Selection Guide

23Door Switch Dimensions (Option)Contact your authorized Thermo King Dealer for specific part numbers.

Seite 18 - Group 31 Battery Dimensions

24Required Tools1. Safety Glasses2. Drill3. Drill Bits4. Tape Measure5. Mechanics Tools6. Lifting Bar7. Work Platform (Recommended)8. Torque Wrench9.

Seite 20

26Installation Components1. Locking Nuts2. Washers3. Self Tapping Screws4. Clamps5. Cable Ties6. Fuel Line Hose1/4 in.3/8 in.7. Fuel Line Fittings1/4

Seite 21 - Triple Combo Display

27Installation Components

Seite 22

28Unpacking the UnitUnits are shipped attached to disposable wooden pallet wrapped with protective cardboard and plastic stretch wrap.NOTE: To avoid u

Seite 23

2Release HistoryReleased 08/06Rev. 1 (01/07) Updated art to show correct 8 wire remote controller harness, multiple door switch harness with diodes an

Seite 24

29Unpacking the Unit

Seite 25 - Required Tools

30Installing the UnitAccess to Mounting Holes (Detail II)1. Top side mounting hole through the hinged roadside grille.2. Center side mounting hole thr

Seite 26

31 Installing the Unit

Seite 27 - Installation Components

32Installing the Drain HosesInstalling the Drain Hoses1. Drain Hoses should run straight down the trailer wall from the unit with no kinks or bends.2.

Seite 28

33Installing the Drain Hoses

Seite 29 - Unpacking the Unit

34Installing the UFLS (Option)Important Installation InformationThe Ultrasonic Fuel Level Sensor (UFLS) should be installed into the fuel tank before

Seite 30

35Installing the UFLS (Option)

Seite 31 - Installing the Unit

36Installing the Fuel Tank - 50 Gallon, 22'' Diameter, AluminumOPEN STYLE TANK MOUNTING BRACKETIMPORTANT FUEL TANK INSTALLATION INFORMATIONE

Seite 32 - Installing the Unit

37Installing the Fuel Tank - 50 Gallon, 22'' Diameter, AluminumOPEN STYLE TANK MOUNTING BRACKETStandard crossmember spacing shown. For other

Seite 33 - Installing the Drain Hoses

38Installing the Fuel Tank - 50 Gallon, 22'' Diameter, AluminumOPEN STYLE TANK MOUNTING BRACKETFuel Tank InstallationNOTE: Location of mount

Seite 34

3SPECTRUM DE SR-2 Multi-Temperature Systems

Seite 35 - Installing the UFLS (Option)

39Installing the Fuel Tank - 50 Gallon, 22'' Diameter, AluminumOPEN STYLE TANK MOUNTING BRACKETOpen Style BracketFlangeOrient Tank Verticall

Seite 36

40Installing the Fuel LinesFuel Line Installation1. Install the fuel line bracket to the pre-drilled hole in the frame. This hole is located in the fr

Seite 37

41Installing the Fuel LinesVerify the factory installed fuel line fittings are tight prior to mounting the bracket onto the frame.

Seite 38

42Installing the UFLS Harness (Option)“Solid State” Ultrasonic Fuel Level Sensor (UFLS)Harness Installation and RoutingNOTE: The Ultrasonic Fuel Level

Seite 39 - Fuel Tank Installation

43Installing the UFLS Harness (Option)Ultrasonic Fuel Level Sensor (UFLS)Heat Shrink TubingCrimp and Solder Style Connectors Interconnect Harness

Seite 40 - Vertically

44Installing the Status Light (Option)InstallationNOTE: Surface mounted status light installation shown, flush mounted light installs into recessed op

Seite 41 - Installing the Fuel Lines

45Installing the Status Light (Option)4-Pin 8-Pin

Seite 42

46DE Split-Evaporator Installation Return AirflowRestrictions of the return airflow adversely affects the performance of the unit. The area directly b

Seite 43 - Harness Connections

47DE Split-Evaporator InstallationIII

Seite 44 - Interconnect Harness

48DE Split-Evaporator InstallationSealing Air GapsNOTE: The following areas must be properly sealed to prevent air leakage and allow the unit to opera

Seite 45 - Installation

4IntroductionInstallation Manual-A was written to assist with the installation of the Thermo King SPECTRUM DE SR-2 refrigeration systems onto trailers

Seite 46

49DE Split-Evaporator Installation I II III

Seite 47 - Bulkhead (Detail I)

50DE Split-Evaporator InstallationTypical DE Split-evaporator InstallationOnly one of many possible configurations is shown for the Spectrum DE applic

Seite 48

51DE Split-Evaporator Installation 288.0 in.(7315 mm)24.00 in.(609 mm)AFD59148710295411316

Seite 49 - Sealing Air Gaps

52Installing the Rear Remote Controller (Option)Foamed-In-Place InstallationNOTE: Verify mounting location and all dimensions before installing the re

Seite 50 - I II III

53Installing the Rear Remote Controller (Option)

Seite 51

54Installing the Rear Remote Controller (Option) Retro-Fit InstallationNOTE: Verify mounting location and all dimensions before installing the1. Cut o

Seite 52

55Installing the Rear Remote Controller (Option)

Seite 53 - Foamed-In-Place Installation

56Installing the Door Switch (Option)When installing CargoLink wireless door switches, see TK 55151 CargoLink Installation Manual. NOTE: These instruc

Seite 54

57Installing the Door Switch (Option)Right Angle MountingTop x Top MountingSide x Side Mounting

Seite 55 - Retro-Fit Installation

58Installing the Door Switch (Option)Contact your Thermo King Dealer for specific part numbers.NOTE: The Door Switch Harness Connectors are located at

Seite 56

5Table of ContentsSafety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Trailer Requiremen

Seite 57

59Installing the Door Switch (Option)Interface Harness Wiring Door Switch WiringRED = (12 Vdc) POWER RED = (12 Vdc) POWERBLACK = (CH) GROUND BLACK = (

Seite 58 - Side x Side Mounting

60CargoWatch™ Sensor Locations (Option)Sensor locations for Domestic Applications as required by customer.1. Sensor #1 is located in the evaporator si

Seite 59

61CargoWatch™ Sensor Locations (Option)

Seite 60

62Connecting the CargoWatch™ Sensors (Option)NOTE: ONLY CargoWatch Sensors Can Be UsedCONNECTING SENSORSNOTE: The sensor are not polarity sensitive.1.

Seite 61

63Connecting the CargoWatch™ Sensors (Option)

Seite 62

64Installing the BatteryNOTE: Thermo King units are designed for one 12 volt, group 31 battery. The battery must be suitable for deep cycling, heavy d

Seite 63

65Installing the BatteryStandard Battery Hold Down BracketOptional Heavy Duty Battery Hold Down Bracket

Seite 64

66Installing the Bottom PanInstallationNOTE: Anti-seize lubricant applied to the threads of the stainless steel mounting hardware is recommended.1. Re

Seite 65 - Installing the Battery

67Installing the Bottom PanMODEL 50 UNITS ONLYThe receptacle box needs to be lifted up to access one of the bottom pans front mounting bolts.

Seite 66

68STOP!SPECTRUM DEMULTI-TEMPERATURESYSTEMS ONLY!TO INSTALL THE SPECTRUM REMOTE EVAPORATORS AND COMPLETE THIS INSTALLATION REFER TO:INSTALLATION MANUAL

Seite 67 - Installing the Bottom Pan

6Safety PrecautionsThe symbol appears next to a point that is particularly important:DANGER: Addresses a circumstance that, if encountered, will lea

Seite 68

69STOPCautionThermo King Multi-Temp host units are shipped with a 35 kPa (5 psi) holding charge of R-404A. This holding charge of approximately 1 kg (

Seite 69 - SYSTEMS ONLY!

Installation Manual-AProviding equipment and services to manage controlled-temperature environments for food and other temperature-sensitive products

Seite 70 - Recover Refrigerant

7Safety Precautions (continued)Battery Installation and Cable Routing RefrigerantFirst AidFROST BITE: In the event of frost bite, the objectives of F

Seite 71

8Trailer RequirementsApproximate WeightSPECTRUM DE (1670 lbs.) to 885 kg (1950 lbs.)DANGER: The front trailer must be structurally strong enough to su

Kommentare zu diesen Handbüchern

Keine Kommentare